Chinaunix首页 | 论坛 | 博客
  • 博客访问: 345340
  • 博文数量: 464
  • 博客积分: 13586
  • 博客等级: 上将
  • 技术积分: 4800
  • 用 户 组: 普通用户
  • 注册时间: 2012-04-02 10:25
文章分类
文章存档

2012年(464)

我的朋友

分类: Delphi

2012-08-21 14:08:48

Personnel training ways in heavy machinery field

The best training program will likely not produce the desired results if the wrong people are being trained. On the other hand, if you hire the best and brightest, but then do not offer learning experiences linked with business goals and individual development needs, the organization will not be likely to achieve its goals.

To address this business issue, we have developed a continuum of services for on-boarding new sales reps that includes best practices in selection, needs analysis, individual development, and sales effectiveness training.

Underground mining of kaolin over the years has been using a hierarchical caving method, within each stratum to the bottom plate from the roof, the courtyard of the ore from the mining area boundary or mineral block boundaries to layout route back stoping ore block price gold refining plant, each slice mining time for 3-4 months, thus reducing the amount of roadway maintenance. The stratification adopted after considering the formation of renewable roof to stop the 1-2 months and then exploitation of the next hierarchical.
One of the keys to integrating selection with training is to ensure the right criteria are used to attract, select, train, develop, and measure for performance. Once the right criteria are identified, it is important to use objective measures to predict success on the job. It is up to each organization to choose one or more of the following that best meet their needs:
In the next few years, the world kaolin market will remain a trend of rapid growth, the production was a growing trend, especially in high-quality soil. Therefore we can say that the prospects for the development of the kaolin industry is very broad.
Realistic Job Previews (RJPs) - A realistic job preview is an honest description of the position which includes both its rewards and challenges. RJPs are designed to simultaneously attract top talent and simplify the recruiting and selection processes by providing the realistic information about the job that helps under-qualified candidates to efficiently select themselves out of the process. RJPs seem to be most effective when presented on-line.
Sand washer is really a type of water washing style equipment to become matched up using the and may lessen the dust and stone powder which mixes using the final sand, so sand washer can improve the standard from the sand. The types of materials range from the needed gravel in building-site, gravel industrial facilities, wave power station and concrete dam site, publish and electric pole factory, gypsum small scale processing plant, glass factory quarta movement sand and re-filling pressure sand. Sand washer is principally utilized in building site, gravel plant, concrete dam building site of wave power station, etc.
 

阅读(5199) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~