As the infrastructure construction in China has intensified, the speed of
urban "metabolism" is accelerating. A large number of old buildings were
removed, and that replaced by the more grand and beautiful buildings. At the
same time, construction waste is accompanied by this invisible metabolites
hinder urban development.
It is understood that we make use of construction
waste to produce recycled aggregate and used for the production of concrete and
other related building materials. It has become common practice around the world
to achieve construction waste resources management. Developed countries have
established advanced technical standards of construction waste recycled
aggregate, and our coountry has made out the relevant standards to promote
construction waste resources work proceeding smoothly.
However, many people
questioned the stability of the construction waste recycled aggregate.
Therefore, the domestic well-known Crusher enterprises, Zhengzhou Red Star
Mining machinery Co., Ltd. director Zhao in Division of construction garbage,
told reporters: "There is no way to guarantee recycled aggregate's stablility
after a simple crush and filter. If it is expected to be stable, we need to
start from the source, according to different material classify and sort
construction waste. And then based on indicators, the materials are fine sorted,
and finally they get through the construction waste disposal equipment for
crushing, grinding, preparation and molding. Only in this way can the recycled
aggregate be ensured relative stability. "
Therefore, for this question, let
us know about the role of the crusher plays in the construction waste. The
crushing method is based on the physical properties of the material, the
material block size and required level of detail. For hard materials, we use
the method of extrusion, bending and splitting; And for brittle materials, the
impact and splitting should be used; If material block is large, splitting and
bending is avaliable; If materials block is small or discharge particle size
requirement is small,
and should
be used. If crushing method was choose incorrctly, it is likely to crush
difficult or excessive crush, both of which will increase the energy consumption
in the process of crushing.
After digestion process and the technical
processing, urban construction waste can be used as recycled aggregate. It not
only solves the problem of shortage of natural aggregate resources and protects
the ecological environment of the aggregate origin, but also solves the issues
such as urban waste piling up, covering, and environmental pollution. And
finally we can realize material recycling of construction waste to ensure the