Chinaunix首页 | 论坛 | 博客
  • 博客访问: 1238379
  • 博文数量: 3010
  • 博客积分: 10011
  • 博客等级: 上将
  • 技术积分: 30431
  • 用 户 组: 普通用户
  • 注册时间: 2008-05-27 11:53
文章分类

全部博文(3010)

文章存档

2008年(3010)

我的朋友

分类: LINUX

2008-05-27 14:54:29

Besides scheduling problems for single and parallel machines and shop scheduling problems the book covers advanced models involving due-dates, sequence dependent changeover times and batching. Also multiprocessor task scheduling and problems with multi-purpose machines are discussed. The methods used to solve these problems are linear programming, dynamic programming, branch-and-bound algorithms, and local search heuristics. Complexity results for different classes of deterministic scheduling problems are summerized.

阅读(99) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~