Chinaunix首页 | 论坛 | 博客
  • 博客访问: 11303318
  • 博文数量: 8065
  • 博客积分: 10002
  • 博客等级: 中将
  • 技术积分: 96708
  • 用 户 组: 普通用户
  • 注册时间: 2008-04-16 17:06
文章分类

全部博文(8065)

文章存档

2008年(8065)

分类: 服务器与存储

2008-07-18 13:53:02

The Fibre Channel hubs and switches, if installed, must be powered on before the host to
insure proper loop initialization.

The power up procedure includes the following steps:

1. Turn on the expansion enclosures.
2. After the last enclosure was powered on, wait for all the disks to be ready (steady green
LED for each disk).
3. Turn on hubs/switches (if attached).
4. Turn on the DS4000 storage server.
5. Turn on the host application server.

The power-down procedure includes the following steps:

1. Turn off the host application server.
2. Turn off the DS4000 storage server.
3. Turn off hubs/switches (if attached).
4. Turn off the expansion enclosures
阅读(495) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~