In fact, participated in the training of concrete mixing station operators are aware of concrete mixing station if so in accordance with the project work is divided into two kinds: one is fully automatic, one is semi-automatic, there are some users will ask both this there are different ways to do what? It is more suitable for me for it? We have to tell you about!
Semi-automatic and fully automatic concrete mixing station main difference is that the control system, the relative concrete mixing station equipment equipments are basically the same. Fully automatic control system using automatic control system, automatic control system with centralized control system;
Concrete mixing plant different control systems at work have different?
1, concrete mixing plant production efficiency rating is the same, the only difference is the work of the different ways; Just click automatic control system operation, the material will automatically unloaded into the screw conveyor from the cement silo, in the by the screw conveyor even in the weighing hopper machine, and then automatic discharge into the , the entire production process, one click of operation will be done automatically, it is very easy to use, very suitable for small mixing station staff;
2, concrete mixing plant control system will not be so simple, it can be said
to be done step by step, to work on the material such as concrete, you tap a
button on the material, then the material will be automatically transported to
the weigh hopper , the need to discharge when the discharge tap the button, the
material will automatically unloaded into a blender, centralized control system
needs more people to participate.