Chinaunix首页 | 论坛 | 博客
  • 博客访问: 74078
  • 博文数量: 165
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 1566
  • 用 户 组: 普通用户
  • 注册时间: 2014-08-19 15:18
文章分类

全部博文(165)

文章存档

2015年(65)

2014年(100)

我的朋友

分类: 其他平台

2015-01-12 10:24:39

The thorough examination steps of commercial are mainly as follows:
Check the wire rope and smear a little butter on it every week to ensure its full operation, and replace the wire rope in a timely manner if it wears seriously. Inspect the oil level of reducer and view the grease of thick oil pump, and replace the grease if it is necessary. The water supply system of commercial concrete batching plant should keep clean in order to avoid congestion, and the suction valve needs a regular inspection and wash.
Turn on the switch arm to check whether it is loose, and make sure it is tight. Check whether the blade, bracket connecting bolt is loose, and appropriately adjust the clearance of blade and cylinder wall. The biggest gap is 5 mm. Each motor and electrical components wiring shall not have loose phenomenon, and the contractor situation of A.C. Contractor should also be checked.
The dust of commercial distribution box should be cleaned, and the limit switch should not be filled with water. The mobile diesel concrete mixer should be checked once a week. And you’d better properly place the mobile diesel concrete mixer if it is not to be used for an extended period of time.
阅读(62) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~