Chinaunix首页 | 论坛 | 博客
  • 博客访问: 74251
  • 博文数量: 165
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 1566
  • 用 户 组: 普通用户
  • 注册时间: 2014-08-19 15:18
文章分类

全部博文(165)

文章存档

2015年(65)

2014年(100)

我的朋友

分类: 其他平台

2014-12-25 11:41:04

control room centralized control by the asphalt concrete mixing plant, concrete mixing plant equipment package power required during operation initiated by a 1-2 Taiwan unit supply.The device is boring tube heating system consists of incineration incineration active control, gas burning, fuel atomization incinerators and weathering than conditioners and other components. Manipulation is a micro-processor, control room operators audience situated in the incineration and incineration of the entire process can be actively controlled, together with self-diagnostic ability, in the process of heating control system exhibits problems, the control device to indicate on lights shine the way appear go wrong code while the device is in manual and manipulator faulty code view on the housing are attached table, asphalt table lists each of the problems a reason code, view the project, whereby the concrete batching plant operator can quickly eliminate problems.
Illnesses appearance
In the course of normal operation once rendered boring tube heater burning flame appearance, the reset control device R7241 and scratch incineration, normal operation and died after about 2h, each future time interval shorter flame until it does not work properly .
阅读(50) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~