Chinaunix首页 | 论坛 | 博客
  • 博客访问: 74247
  • 博文数量: 165
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 1566
  • 用 户 组: 普通用户
  • 注册时间: 2014-08-19 15:18
文章分类

全部博文(165)

文章存档

2015年(65)

2014年(100)

我的朋友

分类: 其他平台

2014-12-19 11:12:31

is a medium-sized type mixer, first apply to larger construction projects, it is very important construction machinery. It is compulsory a horizontal shaft mixer, not only can mix dry hard concrete, lightweight concrete and can stir, is a versatile mixer.
In the mixing process, after a rotary motion of the stirring shaft to the femoral artery and a stirring blade to cut the tube material, kneading and mixing action such as turning over, the material in a relatively intense exercise in mixing adequately,thus it has a mix of good quality, low energy consumption, high power interests. Modern construction projects mixer widely used,not only to reduce the labor intensity, but also improve the quality of concrete works on China Establish the infrastructure to make a great contribution.
State has stepped up efforts to build infrastructure, which commenced on theindustry is very favorable. The primary components of this type mixer planning include: transmission system, mixing system, feeding system, unloading system,electrical control system and other components. In this drawing, we first carried out on the transmission scheme selected and described accounting, but also determine the loading, unloading planning approaches, and leaves, and some parts were checked, so as to meet the mission of abnormal situations begged.
阅读(110) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~