Chinaunix首页 | 论坛 | 博客
  • 博客访问: 74240
  • 博文数量: 165
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 1566
  • 用 户 组: 普通用户
  • 注册时间: 2014-08-19 15:18
文章分类

全部博文(165)

文章存档

2015年(65)

2014年(100)

我的朋友

分类: 其他平台

2014-12-17 10:20:48

The operators of the may sometimes need to move the concrete mixer machine according to the place requirements, and what the appropriate methods of the movement of these concrete mixers? 
Generally speaking, the movement of the concrete mixer machine can be devided into two kinds as long distance movement and short distance movement. For the short one,we’d better move it in a direct way but not a fast way and we should pay much attention to the parts of the concrete mixer machine. Before we move a concrete mixer machine, one thing should be considered is that we should make the concrete mixer stop and make sure the concrete mixer machine is on a good condition. Also we the operators should keep the concrete mixer machine in a steady state especially when we are moving them.While for the long distance movement of the concrete mixer machine, we not only move the concrete mixer machine by our hands but also should get help from other vehicles such as by using the carriers to move the concrete mixer to a new place. Of course, the place we will put the concrete mixer should be flat and firm that may keep our machines in a good state, if there have been a good drainage ditch that may be perfect.The movement of the big construction machines like may confused a lot of people. But with a right movement, that can not be a problem for us anymore.  
阅读(164) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~