If manufacturer wants to be the leader among the management staff, he needs to build good management system after building the concrete mixing plant. Here our main concerning part is what are the right mixing station operations and management in order to generate considerable economic benefits.
1: Give two cars mixed numbers, such as the first home of a car on the 1st, the second gave the first car on the 2nd, when a live line up.
2: Since one is a single number, one is a double number, if alive when pulling the same site, and thus, the cycle, but to be fair, let's say, the last car is the 4th sent, it must be from the next 5 begins.
3: If there are two sites at the same time, you can press cubic assigned to, say, requires 100 square today A site, B site requires 200 square so that each team in the license plate number in circulation, the 150 parties to the two .. If two different numbers of vehicles, in accordance with proportional allocation.
4: Good live breaking live distribution, certainly points to the site of the concrete foundation, hit the floor, laying the ground, hit pillars, beams of the points, if with a better said, if the two sites, say, a regular shop floor, a positive cheddar with concrete pillars, which requires the deployment time, and shipping on the deployment, if this fight pillars discharge every car needs a long time, in accordance with the extracted several times each vehicle for this live, The rest, two left the car, take that live, but shipping needs to be done to adjust, based on distance, time, times, to be balanced, so that you can live shipping mess, after the separation of the total freight to each, according to number of vehicles allocated. slip must also cycle.
5 Then journey length distribution, the site certainly points near and far, and if the site the same day, then two live, we should point distance, which requires accounting of the number of trips from + shipping, you can take a taxi methods calculate the shipping cost according to kilometers.
The qualified manufacturer should not only have a sound management plan, but also need to have some coordination and handling ability of concrete batching plant manufacturer temporary condition during the processing.