Continuous safety inspection before and after use is one of the many necessary prerequisites for continuous concrete mixing plant’s normal operation. Then how to check continuous concrete mixing plant before and after use? 
1, check the continuous concrete mixing plant body is stable. 
2, the blade and mixing blade support arm connecting bolts are secure. 
3, feeding rack bolts are tightened. 
4, whether to add a little water pumps, piping is smooth. 
Each time you use continuous concrete mixing plant should be checked after the project: 
1, clean inside and outside the mixing tube, discharge door, the dust on the hopper and rinse. 
2, hoppers parked in the transport position, and the brake pin inserted, the hopper may not have debris. 
3, cutting continuous concrete mixing plant power, lock the electrical control box.
4, as appropriate continuous lubrication points filling the necessary lubricant (grease).