1.testing all the
before using
2.Loading material in cement mixer shall not be too much at a time
3.fixed personnel boot, the driver should be familiar with the principle of the operating system
4.after
commercial concrete pouring down, the cylinder and the conversion of the mortar should be timely to rinse clean with water.
earnestly implement succession system in
production line.