Chinaunix首页 | 论坛 | 博客
  • 博客访问: 188683
  • 博文数量: 530
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 5321
  • 用 户 组: 普通用户
  • 注册时间: 2014-05-04 11:15
文章分类

全部博文(530)

文章存档

2015年(428)

2014年(102)

我的朋友

分类: Android平台

2015-03-03 11:05:19

Under the low temperature condition in cold areas, the water supply system, discharging door, air cylinder, and mixing blade are easy to freeze, and the water road is easy to meet ice resistance. Before starting the concrete mixer, we must check whether each part is flexible, heat the concrete mixer reducer to prevent control circuit apparatus burnout caused by overload. In the freezing season, the residual water inside the water pump, admixture pump, water tank, and admixture tank should be cleaned out, and we should start the water pump and admixture pump to run one or two minutes.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:ready mixed ,,etc. We will provide you with the best product and service.


The winter maintenance method of concrete mixer. According to the characteristics of , the concrete mixer is located in the mixing building. So when winter comes, we should seal the mixing building and adopt the 2 kw heating tube to heat the mixing building, and the specific installation number of heating tube should be decided according to the temperature.

阅读(113) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~