Chinaunix首页 | 论坛 | 博客
  • 博客访问: 188648
  • 博文数量: 530
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 5321
  • 用 户 组: 普通用户
  • 注册时间: 2014-05-04 11:15
文章分类

全部博文(530)

文章存档

2015年(428)

2014年(102)

我的朋友

分类: Android平台

2015-03-02 08:53:26

Second, grasp the first-tier guide. The government will organize relevant departments to go deep into the enterprises and provide them site instruction. Moreover, they will also conduct a comprehensive inspection to the enterprises according to the “ Ten dust control requirements” of the ready-mixed , so as to timely discover the problems existing in the renovation.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:concrete mixer,,etc. We will provide you with the best product and service.


Cause analysis: the pressure relief signal of the motive electricity cabinet did not reach the PLC of the control cabinet; there is something wrong with the overflow valve itself. Troubleshooting methods: check the line to make the discharge pressure signal arrive in the PLC of the control cabinet; check the overflow valve of the pressure to see whether the pressure releasing mouth is blocked. If it is blocked, remove the barrier.

阅读(82) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~