Chinaunix首页 | 论坛 | 博客
  • 博客访问: 206031
  • 博文数量: 530
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 5321
  • 用 户 组: 普通用户
  • 注册时间: 2014-05-04 11:15
文章分类

全部博文(530)

文章存档

2015年(428)

2014年(102)

我的朋友

分类: Android平台

2015-02-27 17:21:01

All operating personnel should carefully record the quality of the produced concrete and the operation condition of equipment and matters needing attention, and carefully fill in the operation record. In the production process of the , if the operating personnel find the problem, they should find out the reasons and report it to the supervisor. Before production, they should thoroughly clean the portable concrete mixer, and after the shutdown, they should stop all the operations and switch off all of the power switches.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:,,etc. We will provide you with the best product and service.


First, check the brake of JS series , and make the appropriate adjustments. Then check the water pump and throttle valve to see whether these components have leakage phenomenon. Finally, check the open gear and adjust the belt firmness of JS series twin-shaft compulsory mixer in order to avoid belt slippage.

阅读(112) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~