Chinaunix首页 | 论坛 | 博客
  • 博客访问: 189681
  • 博文数量: 530
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 5321
  • 用 户 组: 普通用户
  • 注册时间: 2014-05-04 11:15
文章分类

全部博文(530)

文章存档

2015年(428)

2014年(102)

我的朋友

分类: Android平台

2015-02-13 09:22:05

To sum up, only you put the safety work at the first place can you guarantee the improvement of economic benefits and stable social environment. After work, you should cut off the power supply, clean site, maintain the concrete batching plant. And in winter, in order to prevent freezing equipment, you should pour the water out before leaving. Overload and illegal operations are not allowed in the use process of concrete batching plant.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows: machine,,etc. We will provide you with the best product and service.


And the machine must be immediately stopped if there is any abnormal sound. You should find out the reason and troubleshoot it before you put it into use again. The operating personnel must hold relevant certificates. They must operate the concrete batching plant according to the specification, and do daily maintenance, such as clean, fastening, adjustment, lubrication and corrosion. The concrete batching plant construction site must adhere to the policy of “safety first, prevention first” and the machine managerial personnel must earnestly inspect the machine and ensure that it is in good condition.

阅读(157) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~