Chinaunix首页 | 论坛 | 博客
  • 博客访问: 189682
  • 博文数量: 530
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 5321
  • 用 户 组: 普通用户
  • 注册时间: 2014-05-04 11:15
文章分类

全部博文(530)

文章存档

2015年(428)

2014年(102)

我的朋友

分类: Android平台

2015-02-13 08:57:27

All of the above are the works that we need to do after the shutdown of . Any details can change the future, so we must make timely relevant maintenance and coordination when inspecting the concrete mixing plant. Check the conveyor belt surface of concrete mixing plant and replace the conveyor belt if it is desquamated or ruptured. If the concrete mixing plant will have a long shut down time, then the residuary materials are not allowed to remain in the feeding hopper or stock bin.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:,,etc. We will provide you with the best product and service.


The construction site generally concentrates a large number of operating personnel, construction equipment, materials, and so on. So the security is the problem that must be firstly ensured by enterprises. After the shutdown of concrete mixing plant, we should check the wear pattern of mixing arm and lining plate, check whether it is necessary for us to lubricate or replace the parts, and check to see if the screws are loose. The first thing we need to do is to shut down all the places needing to be closed off, and we should also ensure the correct sequence.

阅读(117) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~