分类: iOS平台
2014-10-21 19:26:02
Ash storage period of up to three months, its re-examination. Also fill in inspection form. Upon receipt of notice of re-examination , the response of the material to be labeled. Test received ash test inspection form fill orders in a timely manner, according to GB12573 requirements while sampling (less than 15kg) to send its central laboratory testing.
Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:sicoma ,,etc. We will provide you with the best product and service.
Concrete in a timely manner by the material of fly ash entering inspection tests , according to the same manufacturer, same batch , same variety , quantity does not exceed 120t, while providing fly warranty book , original certificate , inspection date is the earliest arrival time of the batch of fly ash or fly ash cans filled with a same batch number for the inspection lot of fly ash .