Chinaunix首页 | 论坛 | 博客
  • 博客访问: 72935
  • 博文数量: 127
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 1280
  • 用 户 组: 普通用户
  • 注册时间: 2014-04-16 14:16
文章分类

全部博文(127)

文章存档

2014年(127)

我的朋友

分类: iOS平台

2014-10-10 19:05:51

In the freezing season, the residual water inside the water pump, admixture pump, water tank, and admixture tank should be cleaned out, and we should start the water pump and admixture pump to run one or two minutes.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:,,etc. We will provide you with the best product and service.


After the operation, we should clean up the mixing barrel, discharge door and the hopper, and wash them with water. At the same time, we should wash the additives, supply system and tool apron of weighing system. The tool edge should be cleaned up to ensure its weighing accuracy.

Our company has many years of production experience of , and we strictly control the manufacturing quality of concrete mixing plant, continuously improve the concrete mixing plant, and try our best to provide you with the top-quality concrete mixing plant. Now, we will talk about the announcements about the shutdown of concrete mixing plant below:

阅读(111) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~