Chinaunix首页 | 论坛 | 博客
  • 博客访问: 68573
  • 博文数量: 127
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 1280
  • 用 户 组: 普通用户
  • 注册时间: 2014-04-16 14:16
文章分类

全部博文(127)

文章存档

2014年(127)

我的朋友

分类: iOS平台

2014-05-08 13:40:57

Concrete mixer is one kind of concrete machinery which mixes the cement, aggregates and water into concrete mixture and it is mainly composed of the drum, the feeding and discharging mechanism, a water supply system s, the original motivation, drive mechanism, frame and a supporting device. Concrete mixer is the total production of concrete machinery. A very important job of concrete mixer usage is overloading operation which is an indispensable work to whatever kind of concrete mixer.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:,,etc. We will provide you with the best product and service.


Concrete mixer overloading operation process is: start concrete mixer’s mixing button to let the stirring shaft work normally. Then feed aggregate, cement and sand to the hopper and the charging order is stone – cement – sand. After this operation, start concrete mixer lifting motor, so that the feed hopper can rise to the top end of the track. After unloading the materials to the stirring barrel, users should immediately operate the hopper to the lowest position of track , so that the next cycle charge operates normally and timely.

After finishing concrete mixer discharging, users manipulates tilting turbine reducer button to let concrete mixer restore to working condition. Until then concrete mixer completes a cycle of work and continuously carry on the next operating cycle. Users also pay more attention to the concrete mixer’s maintenance and take good care of concrete mixer to prolong its service life.

阅读(71) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~