2014年(127)
分类: iOS平台
2014-05-08 11:16:09
Concrete mixer inspection before commissioning
Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:,,etc. We will provide you with the best product and service.
1. Check whether the lubrication of the reducer and components is adequate.
2. Check whether the motor and electrical devices wiring are secure.
3. Check whether the connecting bolt is firm, especially moving parts; if there are any loose parts, the operator should fix it immediately.
4. Check whether the wire rope is neatly arranged on the reel, if there are any loose, the rope should be winded again.
Concrete mixer commissioning
1. Start the blender motor, check whether the rotation direction of belt pulley is consistent with the label; if there is any wrong, change the power supply wiring.
2. Start the motor to lift the hopper, check whether the upper and lower limit is firm.
3. Open and close the discharging door manufacturer, and check whether the discharging door in the right place.
4. Start the pump motor, and check the rotation direction.
5. Unscrew the pump screw-plug and pour water into it until the water is full of pump cavity and the suction pipe, and then tighten the screw.