Chinaunix首页 | 论坛 | 博客
  • 博客访问: 53014
  • 博文数量: 27
  • 博客积分: 0
  • 博客等级: 民兵
  • 技术积分: 221
  • 用 户 组: 普通用户
  • 注册时间: 2013-09-11 08:23
个人简介

Our factory's ability is on tope of first three position.

文章分类
文章存档

2013年(27)

我的朋友

分类: IT业界

2013-10-28 10:48:27

  (1) the lifting operation personnel belongs to the special operations personnel, must be conducted by a qualified training agency recognized by the country safety and technical training, upon passing the examination, obtain the special operations personnel operating license holder operation.

  (2) strictly abide by rules of safe operation and enterprise safety management rules and regulations.

  (3) before the lifting operation personnel shall wear personal protective equipment, including helmets, overalls, work shoes and gloves; Check to make sure cleanup job sites, transport routes, removal of obstacles.

  (4) before lifting, , steel wire rope, hook, etc all kinds of machines and tools for inspection, to ensure safe and reliable.

  (5) the lifting job, must have a clear division of responsibilities, work, and in accordance with the crane hoisting the command signal contact signal, unified command.

  (6) with two crane lifting a weight, should be carried out under the direct supervision of relevant departments in the enterprise, and is equipped with special hoisting balance beam, vertical lifting hoist rope shall keep, on each crane load should not exceed the maximum of lifting weight.

  (7) crane should be tied to the bottom of the hanging firmly smoothly, - when lifting crane should be slightly off the ground first interview, confirms the weight hanging on, good braking performance and stability of crane, lifting again. Tied with sharp water chestnut weight lifting, should put a mat. Ban tilt hanging, hanging, pull buried underground or condensation on the ground and equipment.

  (8) when the lifting heavy objects, generally should follow express way, banned from human head over, prohibit the person standing on the lifting of heavy objects, prohibited to hang the heavy processing. Don't focus on content in the air long stay, under special circumstances, if you want to stay temporarily, the cut should be banned on personnel stand or pass under the weight. Crane weight, drivers and controllers shall not be arbitrarily leave work.

  (9) when the crane operation, personnel, engaged in maintenance and repair work is forbidden, banned from a bridge crane span to another bridge crane. In addition to the parking overhaul, ban on bridge crane rails. Mast cranes, rail crane, truck crane, crawler crane, the cantilever and the working station are prohibited in the area. Use the crane lifting electromagnet, shall designate a certain work area, ban someone in this area.

  (10) are the main, two sets of hoisting mechanism of crane, are not allowed to use at the same time the work, vice hook (except special crane design allows).

  (11) crane driver to do "ten".


阅读(788) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~