Wall-mounted installation, check the packing list should be based on product and technical documentation whether the lack or loss during transit torsional deformation of the cantilever beam , shaft rust , bumps , etc. should be corrected or restored , respectively , in addition to every six months to the shaft , bearings and other moving parts to clean , lubricate .
1 cantilever mounted
Cantilever installation, press the following sequence .
1 In the User column on the corresponding position in accordance with drawing punch ;
2 lifted by crane boom , boom with bolts to secure the upper and lower plate , with the water level measurement on the deflection , and then tighten the clockwise rotation of the shaft nut .
3 In the cantilever beam orbit installation of electric hoist, trolley and slewing devices. ( Installation of electric chain hoist in strict accordance with the " maintenance manual " installation.
4 top mounted on the beam C- track. C-type orbit homemade sliding car and should and electric chain hoist electrical control box on the same side .
5 would be carried out on the beam all electrical wires to install, and leave the length of the appropriate power cord. ( See electrical schematic wiring and electrical wiring diagram .. C -track small pulley and the cable were fixed with binding wire bundle .
Note:
1 If the unit is installed outdoors use, the need to install a reliable water-resistant measures .
2 cantilever should be done after the bracket assembly should be done after assembly ① swing arm can rotate around the column 180 ° flexible ; ② Adjust shims to make ends meet on the cantilever deflection F ≥ R/250 (R is the radius of gyration .