Chinaunix首页 | 论坛 | 博客
  • 博客访问: 209572
  • 博文数量: 134
  • 博客积分: 5005
  • 博客等级: 上校
  • 技术积分: 1410
  • 用 户 组: 普通用户
  • 注册时间: 2011-12-13 11:40
文章分类

全部博文(134)

文章存档

2012年(106)

2011年(28)

我的朋友

分类: 网络与安全

2012-02-14 13:53:17

First of all: Determine the technology parameter locations really are precise (reset)

 

Subsequently: Shot engraving model is normally initiated first of all just by the setting of all the results (re-export)

 

Other: determine or possibly a model previously had never totally reset (correction)

 

Suit: Determine all the results vent out and therefore the programs locations are often the equal (reset)

Fifth: Determine the floor insert is normally good, when static disturbance statistics tier (re-ground)

 

6th: Change out all the laptop computer results vent out try

 

Page: Re-install the technology and additionally re-set try

 

Eighth: re-install personal computers and additionally programs thereafter trying out

 

9th: laptop computer motherboard vent out marring come to be surface area or possibly superceded.

阅读(534) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~