Chinaunix首页 | 论坛 | 博客
  • 博客访问: 584008
  • 博文数量: 1460
  • 博客积分: 3940
  • 博客等级: 中校
  • 技术积分: 15380
  • 用 户 组: 普通用户
  • 注册时间: 2008-09-12 10:48
文章分类

全部博文(1460)

文章存档

2011年(119)

2010年(1070)

2009年(243)

2008年(28)

我的朋友

分类:

2010-11-13 09:20:49

sidewalks and landscaping Assembly of the new guest moorage activity float was accomplished this past however month. Three steel guide piles were installed along the east edge of this float system. New lighted power pedestals line the activity float’s east and west sides. A walkway along the center of the float is now open to allow access to the existing north guest moorage floats. The new 80 foot gangway was set in place at the north end of the activity float which will provide much easier access to the guest moorage area in all tidal conditions. Completion of the on-dock utilities and fire suppression system will take place in November.

At the top of the bulkhead above the guest moorage area, the new promenade is beginning to take shape. Two beautiful stamped concrete compass roses flanking the north and south ends of this area have been completed. Surrounding each of the compass roses are concrete multi-height seat walls. All along the bulkhead new lighting has been installed.

In the next several weeks, work will be accomplished to tie this entire area together with sidewalks and landscaping. The new promenade area will soon provide a true gathering place for Marina visitors of all ages whether they arrive by water or by land.
阅读(93) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~