Chinaunix首页 | 论坛 | 博客
  • 博客访问: 19882239
  • 博文数量: 679
  • 博客积分: 10495
  • 博客等级: 上将
  • 技术积分: 9308
  • 用 户 组: 普通用户
  • 注册时间: 2006-07-18 10:51
文章分类

全部博文(679)

文章存档

2012年(5)

2011年(38)

2010年(86)

2009年(145)

2008年(170)

2007年(165)

2006年(89)

分类: 项目管理

2008-06-06 11:10:14

 

 

<>>

 

 

<>>

 

Firstname.Lastname>>

 

Revision No – A0

 

Issue Date - <<MM/DD/YY>>

 

 

 

 

DOCUMENT PDS ID: SOP402SZ_16

 

PRODUCT: 

 

RELEASE:

 

FEATURE:

 

SUBSYSTEM:

 

DISTRIBUTE TO:

 

 


 

Revision History

 

Revision #

Author

Reviewed By

A. Description Of Change, Including MR No.

B. Summary of Review

Issued by / Date (mm/dd/yy)

0.1 (draft)

 

 

New document

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UTStarcom Proprietary

Not for use or disclosure outside UTStarcom, Inc. or any of its subsidiaries

Except under prior written agreement.

 

Other Intended Audience:          Quality Assurance Group & Internal Auditors.

This document is controlled electronically and any hard copy should be considered uncontrolled.

The latest version of this document may be obtained from the PDS ID - UTSI-SZRD-2002xxxx.

This document is owned by <>.


 

Keywords:

The purpose is for searching docs in PDS.

 

 

Abstract:

This document describes the template of Generic Project Document, will be the same with the Document during R&D procedure. Such as: SRS (System Requirement Specification), HLD (High Level Design), DTD ( Detail Design), etc. All the Procedure Documents also need to be carried out a corresponded document template. Such as System Requirement Specification Template.

 


 

Table of Contents

 

1.1.     Document purpose. 5

1.2.     Document scope. 5

 


1.1.  Document purpose

The section shall contain the description of the purpose of the document e.g. document contents, intended use, various groups, who will use this document etc.

1.2.  Document scope

This section describes the scope of the document. It should state the coverage of the document. Any other specific information about the document may also be included.

This section gives a list of reference documents referred in the document, along with their version nos and PDS ID (if available).

1. Generic Project Document Template.dot, SZ, PDS ID: UTSI-SZRD-2002XXXX.

2. Project Document List, SZ, PDS ID: UTSI-SZRD-2002XXXX

List important definitions, symbols and abbreviations used in the document.

List the subsystems that are covered in this test.

mphases Testing

Overview of emphases testing



Diagram Here
 

 

 

 

 

 

 

 

 


and coverage

Table of mapping between SRS and test case sets

SRS name

Test Case Sets Name

 

 

Give a description of a whole test. Such as how many test round, the purpose of each round, etc.

Requirement

List all the hardware required in the test, including UT hardware and 3rd party hardware.

Requirement

List all the software required in the test, including UT software and 3rd party software.

List of equipment needed to perform testing.

and Manpower

Estimated time frame and manpower required for perform testing.

Feature

Manpower

Remark

 

 

 

The general test schedule:

 

Duration

Resource

Remark

Round 1

 

 

 

 

 

 

 

List the reasons that may affect to perform testing. And give a description about the affection.

No

Risks

Severity

Probability of occurrence

Priority

Impact on Project

Contingency

Plan

1.

 

 

 

 

 

 

 

阅读(10606) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~