Firstname.Lastname>>
Revision No – A0
Issue Date - <<MM/DD/YY>>
DOCUMENT
PDS ID: SOP402SZ_16 |
|
PRODUCT: |
RELEASE: |
FEATURE: |
SUBSYSTEM: |
DISTRIBUTE
TO: |
Revision History
Revision # |
Author |
Reviewed By |
A. Description Of Change, Including MR No. B. Summary of Review |
Issued by / Date (mm/dd/yy) |
0.1
(draft) |
|
|
New
document |
|
Other
Intended Audience: Quality
Assurance Group & Internal Auditors.
This
document is controlled electronically and any hard copy should be considered
uncontrolled.
The
latest version of this document may be obtained from the PDS ID - UTSI-SZRD-2002xxxx.
This
document is owned by <
Keywords: The purpose is for
searching docs in PDS. |
Abstract: This document describes
the template of Generic Project Document, will be the same with the Document
during R&D procedure. Such as: SRS (System Requirement Specification),
HLD (High Level Design), DTD ( Detail Design), etc. All the Procedure
Documents also need to be carried out a corresponded document template. Such
as System Requirement Specification Template. |
Table of Contents
The section shall contain the description of the purpose of
the document e.g. document contents, intended use, various groups, who will use
this document etc.
This section describes the scope of the document. It should
state the coverage of the document. Any other specific information about the
document may also be included.
This section gives a list of reference documents referred in
the document, along with their version nos and PDS ID (if available).
1. Generic Project Document Template.dot, SZ,
PDS ID: UTSI-SZRD-2002XXXX.
2. Project Document List, SZ,
PDS ID: UTSI-SZRD-2002XXXX
List important definitions, symbols and abbreviations used
in the document.
List the subsystems
that are covered in this test.
Overview of emphases testing
Table of mapping between SRS and test case sets
SRS name |
Test Case Sets
Name |
|
|
Give a description of a whole
test. Such as how many test round, the purpose of each round, etc.
List all the hardware required in the test,
including UT hardware and 3rd party hardware.
List all the software required in the test, including UT software and
3rd party software.
List of
equipment needed to perform testing.
Estimated time
frame and manpower required for perform testing.
Feature |
Manpower |
Remark |
|
|
|
The general test schedule:
|
Duration |
Resource |
Remark |
Round 1 |
|
|
|
|
|
|
|
List the reasons that may affect to perform testing. And
give a description about the affection.
No |
Risks |
Severity |
Probability of
occurrence |
Priority |
Impact on
Project |
Contingency Plan |
1. |
|
|
|
|
|
|