IBM认证考试相当热门,这里就和大家简单分享一下其中的一门考试——考试。

其实,建议大家的是,在参加这门考试之前,先去IBM认证官网上查询一下这门考试的考试时间,考试的几个要求,考试费用这些必须要知道的,还有就是在一定要认真准备考试,毕竟考试的费用也是相当高的。

 时间充足的话,可以买一些的书自己看看,多理解理解,如果时间和精力不允许的话,那你可以直接找来真题进行模拟练习,因为做真题的效果是很明显的,可以及时查漏补缺,当然了有条件的话,建议你找模拟软件进行真实考试环境的模拟,那样的效果更好!

 1. A customer is interested in assigning the devices located in the front and back of the media drawer of the p670 to multiple LPARs. What should be the suggested configuration?

A. Media drawer front and back connected to dual ported SCSI adapter

B. Media drawer front and back connected to single ported SCSI adapter

C. Media drawer front and back connected to integrated SCSI adapter

D. Media drawer front and back assigned to an empty slot in I/O drawer one

Answer: B

2. The function Rebuild Managed System can be used to do which of the following?

A. Refresh the NVRAM from the current HMC settings

B. Clear out all the defined partitions from NVRAM

C. Clear out all the defined partitions from the HMC

D. Refresh the HMC from the NVRAM settings

Answer: D

3. The HMC "Contents area" displays the system operating state as "incomplete" What should be done to correct this problem?

A. Rebuild the managed system

B. Hard reset the partition profile

C. Soft reset the partition profile

D. Select the managed system icon and choose recover partition data

Answer: A

4. What task must be done immediately before upgrading the software on the HMC to save the system performance?

A.Save upgrade data

B.Backup critical console data

C.Backup system profiles to diskette

D.Save system preferences from CEC properties

Answer:A

5.A system administrator wants to move the media drawer CD-ROM on a p670 dynamically between two active partitions using the HMC. What steps are required to perform this task?

A.1) From HMC select Dynamic Reconfiguration window, click move

2) Select group U1.1.9-P1-15 for CD-ROM

3) Select to and from in Dynamic Reconfiguration, click move

B.1) From HMC select Dynamic Reconfiguration window, click move

2) Select group U1.1.18-P1-I10 for CD-ROM

3) Select to and from in Dynamic Reconfiguration, click move

C.1) From HMC select Dynamic Reconfiguration window, click move

2) Select group 128 for CD-ROM location

3) Select to and from in Dynamic Reconfiguration, click move

D.1) From HMC select Dynamic Reconfiguration window, click move

2) Select group 128 slot 5 for CD-ROM location

3) Select to and from in Dynamic Reconfiguration, click move

Answer: B

6. A company wants to partition a newly purchased p690 system. The system has AIX 5.1 with 16 CPUs,

32GB of memory and two I/O drawers. What is the maximum number of partitions that can be configured

with greater than 16GB memory?

A.0

B.1

C.2

D.3

Answer: A

 