Chinaunix首页 | 论坛 | 博客
  • 博客访问: 289324
  • 博文数量: 469
  • 博客积分: 2510
  • 博客等级: 少校
  • 技术积分: 5200
  • 用 户 组: 普通用户
  • 注册时间: 2008-06-03 16:15
文章分类

全部博文(469)

文章存档

2011年(82)

2010年(284)

2009年(69)

2008年(34)

我的朋友

分类:

2011-01-11 10:24:58

IBM Certification III 考试题库由我们专业IT认证讲师及产品专家精心打造,包括了当前最新的全真考试试题,全部附有正确答案。题库的覆盖率在96%以上,在考试认证厂商对考题做出变化时,网站将及时更新题库,最终确保考生能一次顺利通过考试。

 000-050IBM认证的一门重要的考试科目,考生在参加考试之前,需认真了解最新的考题信息:

VUE/Prometric考试代号:

认证名称:Rational Quality Manager v2.0

版本号:V8.02

考题数量:70

更新日期:2010-12-23

1.The list of test environments can be used for what purpose?

A. to automatically locate resources containing the specified environments

B. to automatically generate the actual test environments needed to run specific tests

C. to automatically select available machines during test execution

D. to automatically create unique test logs for each environment

Answer: B

2.In the Requirements section of the test plan, what happens when you click on the green plus sign icon?

A. A new requirement is added to the test plan.

B. An existing requirement is added to the test plan.

C. A requirement is imported into the test plan.

D. test case is created from the requirement.

Answer: B

3.When generating a new test execution record from the Test Execution Record section of an open test case, which tabs does the Advanced Properties link show?

A. One-way, Pair-wise, and Four-way Interaction

B. Test Plan, Test Suite, and Test Environment

C. Lab resources, Reservations, and Milestones

D. Inclusions, Exclusions, and Weightings

Answer: D

4.Quality Objectives defined in the System Properties can be used in which sections of the test plan?

A. Business Objectives, Test Objectives, and Quality Objectives

B. Business Objectives, Test Environments, and Quality Objectives

C. Entry Criteria, Exit Criteria, and Quality Objectives

D. Entry Criteria, Exit Criteria, and Business Objectives

Answer: C

5.You can copy content from an external document and paste it into which sections of the test plan?

A. Summary, Entry Criteria, Exit Criteria

B. Summary, Pre-Condition, and Post-Condition

C. Summary, Quality Objectives, and Resources

D. Summary, Business Objectives, and Test Objectives

Answer: D

6.Which Custom Reporting component stores the reports, data source connections, and server and user preferences?

A. Data Warehouse

B. WebSphere Application Server

C. Framework Manager

D. Content Store

Answer: D

7.Which statement is true about review processes?

A. Authorization is off by default; new Task-Review work items are listed as Pending.

B. Authorization is on by default; new Task-Review work items are listed as Pending.

C. Authorization is off by default; new Task-Review work items are listed as New.

D. Authorization is on by default; new Task-Review work items are listed as New.

Answer: A

8.Who typically creates the test plan initially with Rational Quality Manager?

A. Test Lab Manager

B. Test Engineer

C. Test Manager

D. Project Manager

Answer: C

  以上只是这门考题的部分题目,如需下载更多完整的题库,可登陆

阅读(160) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~