分类:
2010-08-26 16:22:47
关于这门考试,你需了解一下信息:
考试代号:
认证名称:novell edirectory design and implementation
版本号:V8.02
考题数量:116道
更新日期:2010-8-14
现将整理后的考题和大家分享:
1.You are the network administrator for your company and are in charge of your company's eDirectory design and implementation project. You have completed the project approach phase of the eDirectory design cycle. Which tasks still need to be completed before you begin the implementation phase? (Choose 2.)
A.Design the eDirectory tree
B.Fine-tune the eDirectory design
C.Determine accessibility needs
D.Plan a time synchronization strategy
E.Gather business information related to network design
Correct:A C
2.After you create object naming standards, what should be defined for the attribute standards? (Choose 2.)
A.Which object types require attributes
B.Whether the attribute of an object is required
C.Whether the attribute of an object is purgeable
D.Whether the attribute of an object is unique from other object attributes
E.Whether the attribute of an object is a system attribute that is automatically populated by eDirectory
Correct:B E
3.Your company has 15 sites connected by a WAN link to corporate headquarters. Corporate headquarters has 50 servers and each of the 15 sites has 30 servers. You are implementing a multiple time provider group time synchronization strategy. Which are considerations you should make before implementing this strategy? (Choose 2.)
A.If possible, create local time providers.
B.There will be a single point of failure at each location.
C.You cannot exceed 7 primary time servers in your network.
D.Make sure each reference server will synchronize with the same external source.
E.The single reference time synchronization strategy will provide a better strategy for this network
structure.
Correct:A D
4.Which DNS/DHCP object contains resource record sets for DNS root servers?
A.DNS Zone object
B.DNS Group object
C.DNS Locator object
D.DNS Name Server object
E.RootSrvrInfo Zone object
Correct:E
5.What does WAN Traffic Manager control? (Choose 2.)
A.Events initiated by administrators or users
B.Server-to-server traffic generated by eDirectory
C.Server-to-server traffic generated by time synchronization
D.The amount of eDirectory traffic based on cost of traffic and time of day
E.Which servers the master replica server synchronizes to by using configured lists
Correct:B D
6.Which statement is true of queue-based printing?
A.The print server object must be associated with a volume object.
B.The printer object must be associated with a print server object.
C.The print queue object must be associated with a print server object.
D.The print server, print queue, and printer objects must all reside in the same container.
E.The print server, print queue, and printer objects must all reside in the same container as the
corresponding server object.
Correct:B
以上只是这门题的部分题目,如需下载完整的题库,可登陆!