Chinaunix首页 | 论坛 | 博客
  • 博客访问: 673133
  • 博文数量: 1655
  • 博客积分: 10000
  • 博客等级: 上将
  • 技术积分: 16800
  • 用 户 组: 普通用户
  • 注册时间: 2008-05-28 11:10
文章分类

全部博文(1655)

文章存档

2008年(1655)

我的朋友

分类: LINUX

2008-05-28 13:08:56

Besides scheduling problems for single and parallel machines and shop scheduling problems the book covers advanced models involving due-dates, sequence dependent changeover times and batching. Also multiprocessor task scheduling and problems with multi-purpose machines are discussed. The methods used to solve these problems are linear programming, dynamic programming, branch-and-bound algorithms, and local search heuristics. Complexity results for different classes of deterministic scheduling problems are summerized.

阅读(195) | 评论(0) | 转发(0) |
给主人留下些什么吧!~~