分类:
2009-09-23 15:01:39
HP Integrity 服务器和 HP 9000 服务器
HP-UX11i-V2安装手册
Ver1.0
安装计划支持中心
运维服务事业部
中国惠普有限公司
目录
惠普安装计划支持中心提供对HP9000及HP integrity 服务器的安装服务。安装过程如下:
|
|
|
|
Network interface card to use from the list below. The card should now be physically connected to the network. Other network interfaces may be configured using SAM after the system has booted. Interface Name Hardware Path Type --------------------------------------------------------------------------------------------- Lan0 0/0/0/1/0 HP A7109-60001 PCI 1000 Base-T Core Lan1 0/0/10/1/0 HP A6847-60101 PCI 1000 Base-SX Adapter Lan2 0/0/12/1/0 HP A6847-60101 PCI 1000 Base-SX Adapter Lan3 1/0/0/1/0 HP A7109-60001 PCI 1000 Base-T Core Lan4 1/0/10/1/0 HP A6847-60101 PCI 1000 Base-SX Adapter Enter the name of the lan interface you would like to configure followed by [enter] or just press the [enter] to select the default interface (lan0): |
This section enables you to set the system clock. ________________________________________________________________________ The current system time is Fri Mar 10 16:14:34 2006 Is this correct? Press [y] for yes or [n] for no, then press [Enter] y ________________________________________________________________________ This section enables you to set the "root" password for the system. The "root" account is used for system administration tasks. To insure the security of the system, the root account should have a password. ________________________________________________________________________ Do you want to set the root password at this time? Press [y] for yes or [n] for no, then press [Enter] y New password: Re-enter new password: ________________________________________________________________________ Note: As installed, your system does not have all of its disk space available for immediate use. If this system was factory installed, this was done to allow flexibility in configuring your system. You may use the LVM (Logical Volume Manager) portion of SAM to allocate more disk space for your use. You currently have a total of 124256 megabytes of disk space unallocated in 1 Logical Volume group(s). After the system has finished starting up, you may run /usr/sbin/sam to allocate this space to your needs. _______________________________________________________________________ Press [Enter] to continue... ________________________________________________________________________ Congratulations! …… |
|
发送《场地准备通知》及《安装计划手册》 用户准备机房环境 用户反馈机房环境准备情况 设备到货验收
对于购买了安装服务的设备,惠普公司将负责安装。下表列出了安装工作的工作范围:
安装工作内容 | |
安装前的准备工作 |
惠普公司负责安装的工程师将在安装前协助客户进行设备的到货验收;在安装时指导系统搬运和就位;检查安装现场的电源准备情况并测试电压、温度、湿度等环境参数。 |
硬件设备安装 |
硬件设备的安装包括: 协助电源插座连接 惠普设备硬件系统的安装(包括购买了升级服务的硬件扩容安装) 主机与存储设备间线缆的连接 设备各种连接线缆的整理 设备的加电检测 存储设备的初始化及客户化配置(视购买的服务而定) 主机和存储设备等固件程序的升级(将视实际情况而定) 安装并测试“远程登陆Modem” |
软件的安装和配置 |
软件的安装和配置包括: 操作系统的调整,包括文件系统、内核参数、SWAP区设置等 网络参数的配置 补丁程序的安装 完成惠普公司规定的service notes 介绍ISEE并帮用户开通即时支持服务 协助用户在网上在线申请Codeword 相关软件配置:MirrorDisk,MC/SG,TruCluster, OV等 (均需确认已购买了配置服务) 指导客户备份操作系统 在客户PC端安装Remote Console 软件 (仅限于Alpha环境) |
培训和验收 |
安装完成后,惠普公司将提供一小时的现场基本培训服务,包括: 设备日常维护简介 ISEE/ITRC远程支持服务介绍 报修流程介绍 最后确认设备工作正常并完成安装。 |
用户有义务完成以下工作:
工作内容 |
备注 | |
1 |
适用于设施的特殊安全需要 |
诸如安全的许可证访问者或厂商的徽章 |
2 |
安排机械设备及人力卸货,拆箱 |
拆箱时要安排宽敞空间,点货前后要注意保存,以防遗失 |
3 |
安排机械设备及人力将系统运送就位 |
事先检查搬运通道是否通畅,特别注意净空及拐弯处。货物重量是否低于电梯负荷重量 |
4 |
安排专业电工连接插座,插头 |
事先需购买符合标准的电源连接器 |
5 |
安排保洁人员清理安装现场杂物 |
注意检查,以免丢弃有价值物品或说明书 |
6 |
注意保管《软件许可证》和光盘 |
重装系统时需要使用 |
7 |
建议客户准备一台PC服务器并安装Remote Console (仅针对Alpha环境) |
便于惠普提供远程诊断服务。 |
8 |
在机房内增加电话线,供远程拨号用 |
发生故障时,供惠普支持中心远程登陆 |
9 |
配合开通ISEE服务 |
准备能访问internet的连接,需访问isee.asiapac.hp.com |
10 |
协调集成商和软件提供商与惠普工程师讨论安装及配置参数 |
需提供安装中用到的各种技术参数:IP,内核参数,补丁列表等。 |
11 |
协调好各厂商配合惠普工程师的安装工作 |
|